0:00:00
-4009 days 2:25:55
Assignment is over

popuph14 labb 2


Time elapsed

8760:00:00

Time Remaining

0:00:00

Starts in

-4009 days 2:25:55

Ends in

-3644 days 2:25:55

Start

2013-12-31 01:00 CET

End

2014-12-31 01:00 CET

Visit Results
Log in

popuph14 labb 2

Problems

Name Solved / Tries Average tries Average tries to solve
A All Pairs Shortest Path 10/103 (10%) 6.06 4.50
B Eulerian Path 7/59 (12%) 5.36 6.14
C Maximum Flow 14/70 (20%) 4.67 3.86
D Minimum Cost Maximum Flow 1/12 (8%) 6.00 1.00
E Minimum Cut 5/14 (36%) 2.33 2.20
F Minimum Spanning Tree 15/100 (15%) 5.88 5.67
G Single source shortest path, non-negative weights 19/104 (18%) 4.95 4.95
H Single source shortest path, time table 13/24 (54%) 1.85 1.85
I Single source shortest path, negative weights 5/92 (5%) 6.57 4.60